200 Amp 20–40 Circuit Service Upgrade
01. Service Equipment
Remove/modify as needed; install 200 A, 20 to 40-circuit panel with appropriate single/double-pole breakers; Meter Base with Connected Emergency Disconnect per NEC 230.85; up to 35 ft SEU with proper routing.
NEC Article 230 — Service Equipment and Disconnects
02. Surge Protection
Whole Home Surge Protector per NEC 230.67; test and label.
NEC Article 230
03. Grounding & Bonding
Install/verify grounding electrode system (primary/secondary), bond cold water piping within 5 ft of entry, bond water meter, and install ISBT in line with the grounding electrode conductor.
NEC Article 250
04. Wiring & Safety
Route conductors in approved enclosures/raceways; de-energize; generalized labeling and circuit mapping.
NEC Articles 210–240; 250–300
05. Testing & Documentation
Verify proper voltages and disconnect operation.
06. Exclusions
Anything beyond 200 A/20 to 40 circuits, cosmetic work, or utility fees not specified.
Code Compliance Notes
The above references align with the 2020 NEC structure. Confirm any local amendments with the Authority Having Jurisdiction (AHJ).